The Clean Air Act’s Renewable Fuel Standard Program (42 U.S.C. 7547(o)(2)(A)(i)) calls for annual increases in the amount of renewable fuel introduced into the U.S. fuel supply and sets annual targets for renewable fuel volumes. Each year, EPA implements those targets but has certain waiver authorities to reduce the annual targets below the statutory levels. Companies that produce renewable fuels argued that EPA’s 2019 volume levels (83 Fed. Reg. 63,704) were too low; fuel refiners and retailers argued that the 2019 volumes were too high. Environmental organizations challenged various aspects of the 2019 Rule relating to environmental considerations.The D.C. Circuit denied their petitions for review except for the environmental organizations’ challenges concerning whether the 2019 Rule would affect listed species, which it remanded without vacatur. The court upheld EPA’s 2019 continuation of its practice of granting exemptions to small refineries after promulgating the annual percentage standards; EPA’s decision to exclude electricity generated from renewable biomass (a form of cellulosic biofuel) from its cellulosic biofuel projection in the 2019 Rule; EPA’s determination that the 2019 volumes would not cause severe economic harm; and EPA’s decision not to obligate ethanol blenders under the RFS Program. EPA adequately explained its refusal to exercise the inadequate domestic supply waiver. EPA did not act arbitrarily in estimating that 100 million gallons of sugarcane ethanol were “reasonably attainable” for 2019. View "Growth Energy v. Environmental Protection Agency" on Justia Law

by
The Fourth Circuit considered two petitions for review challenging FERC's issuance of a license to McMahan, authorizing McMahan to operate the Bynum Hydroelectric Project on the Haw River in North Carolina. Assuming without deciding that a state may waive its certification authority under section 401 of the Clean Water Act by coordinating with an applicant in a scheme to defeat the statutory review period through a process of withdrawing and resubmitting the certification application, the court concluded that FERC's finding of coordination between McMahan and NCDEQ is not supported by substantial evidence. Furthermore, without evidence of improper coordination, the court concluded that FERC erred by determining that North Carolina waived its certification authority under section 401.In Case No. 20-1655, the court granted NCDEQ's petition for review of FERC's determination that NCDEQ waived its rights under the Clean Water Act to issue a water quality certification for the Project. The court vacated the license issued by FERC and remanded with instructions for FERC to reissue the license to include the water-quality conditions imposed by NCDEQ. In Case No. 20-1671, the court dismissed for lack of jurisdiction that portion of PK Ventures' petition for review challenging the validity of McMahan's state applications for a section 401 certification. Finding no merit to the remaining claims, the court otherwise denied the petition for review. View "North Carolina Department of Environmental Equality v. Federal Energy Regulatory Commission" on Justia Law

by
In this complaint alleging violations of the Clean Water Act (CWA), 33 U.S.C. 1251 et seq., and the Resource Conservation and Recovery Act (RCA), 42 U.S.C. 6901 et seq., the First Circuit vacated the order of the district court granting a motion to stay the proceedings under the so-called doctrine of primary jurisdiction, holding that the district court improperly stayed the case.Conservation Law Foundation, a not-for-profit organization, brought this suit against ExxonMobil Corporation, ExxonMobil Oil Corporation, and ExxonMobil Pipeline Company (collectively, ExxonMobil), alleging unlawful violations at ExxonMobil's petroleum storage and distribution terminal in Everett, Massachusetts. After the district court denied ExxonMobil's motion to dismiss, ExxonMobil moved to stay the case under the doctrine of primary jurisdiction until the Environmental Protection Agency (EPA) issued a decision on ExxonMobil's pending permit renewal application for the Everett terminal. The First Circuit vacated the stay order, holding that the district court erred in granting a stay under the doctrine of primary jurisdiction until EPA issues a new permit for ExxonMobil's Everett terminal. View "Conservation Law Foundation v. ExxonMobil Corp." on Justia Law

by
Arising under the 2006 version of La. R.S. 30:29 (referred to as Act 312), this oilfield remediation case involved the Vermilion Parish School Board (“VPSB”), individually and on behalf of the State of Louisiana, as petitioner, and Union Oil Company of California, Union Exploration Partners (collectively, “UNOCAL”), Chevron U.S.A., Inc., Chevron Midcontinent LP, and Carrollton Resources, LLC as defendants. Although the exact date of VPSB’s knowledge of contamination to the land was disputed, it was clear that VPSB became aware of such sometime in 2003 or 2004. In September 2004, VPSB filed a petition, urging causes of action for negligence, strict liability, unjust enrichment, trespass, breach of contract, and violations of Louisiana environmental laws. VPSB sought damages to cover the cost of evaluating and remediating the alleged damage and contamination to the property. It also sought damages for diminution of the property value, mental anguish, inconvenience, punitive damages, and stigma damages. UNOCAL sought reversal of the lower courts’ finding that VPSB’s strict liability claim was not prescribed. UNOCAL also contested the court of appeal’s ruling that the jury verdict was inconsistent and its remand for a new trial. Finding UNOCAL failed to prove that VPSB’s strict liability cause of action was factually prescribed, the Louisiana Supreme Court affirmed the court of appeal’s ruling on prescription, but on alternative grounds. Finding the jury was improperly allowed to decide issues reserved solely for the trial court, and cognizant the extraneous instructions and verdict interrogatories permeated the jury’s consideration of the verdict as a whole, the Supreme Court vacated the trial court’s judgment and affirmed the court of appeal’s remand for new trial. View "Louisiana v. Louisiana Land & Exploration Co. et al." on Justia Law

by
The First Circuit affirmed the judgment of the district court denying a preliminary injunction barring construction of Segment 1 of a planned five-segment electric transmission power corridor in Maine, holding that Plaintiffs failed to show a likelihood of success on the merits.The planned transmission power corridor was part of a larger project that would run from Quebec, Canada to Massachusetts. After its performance of an environmental assessment, the Army Corps of Engineers issued a permit authorizing Central Maine Power, a private company, to take three actions in Segment 1. Plaintiffs, environmental organizations, sought preliminary injunctive relief. The district court rejected Plaintiffs' challenges and denied relief. Plaintiffs then brought this interlocutory appeal and filed an emergency motion for injunction pending appeal. The First Circuit affirmed, holding that Plaintiffs' challenges did not demonstrate a likelihood of success on the merits. View "Sierra Club v. United States Department of Army Corps of Engineers" on Justia Law

by
In January 2020, the Energy Facility Siting Council adopted permanent rules addressing the process for amending site certificates and other procedural aspects of the council’s work. Petitioners challenged three of the council’s new rules on two grounds, contending the rules exceeded the council’s statutory authority. According to petitioners, two of the rules improperly limited party participation in contested case proceedings, and the third rule improperly authorized the expansion of site certificate boundaries without a site certificate amendment. The council disputed those arguments. The Oregon Supreme Court concurred with petitioners’ arguments and declared the three rules at issue invalid. View "Friends of Columbia Gorge v. Energy Fac. Siting Coun." on Justia Law

by
In 2012, U.S. Fish and Wildlife Service scientists discovered that endangered mussels were dying on the banks of Indiana's Tippecanoe River. The Service focused on the upstream Oakdale Dam, which significantly restricts the flow of water downstream in order to generate hydroelectricity and to create a lake. The Service worked with Oakdale's operator to develop new procedures that would require the dam to release more water during droughts. After a lengthy process of interagency cooperation and public dialogue, the new procedures were approved by the Federal Energy Regulatory Commission, which has licensing authority over hydroelectric dams on federally regulated waters.Local governmental entities sought review of the Commission’s decision and the Service’s Biological Opinion upon which the Commission relied. The D.C. Circuit affirmed in part. The court rejected some challenges to the validity of the Biological Opinion, which were not raised on rehearing before the Commission. There was otherwise no error in the agencies’ expert scientific analyses. The agencies failed to adequately explain why the new dam procedures do not violate a regulation prohibiting the Service from requiring more than “minor” changes to the Commission’s proposal for dam operations. Because vacating the agencies’ decisions would subject the dam operator to contradictory legal obligations imposed by separate agencies, the court remanded to the Commission without vacatur for further proceedings. View "Shafer & Freeman Lakes Environmental Conservation Corp. v. Federal Energy Regulatory Commission" on Justia Law

by
Taylor Energy leased and operated Gulf of Mexico oil and gas properties, on the Outer Continental Shelf, offshore Louisiana. In 2004, Hurricane Ivan destroyed those operations, causing oil leaks. The Outer Continental Shelf Lands Act, the Clean Water Act, and the Oil Pollution Act required Taylor to decommission the site and stop the leaks. Taylor and the Department of the Interior developed a plan. Interior approved Taylor’s assignments of its leases to third parties with conditions requiring financial assurances. Three agreements addressed how Taylor would fund a trust account and how Interior would disburse payments. Taylor began decommissioning work. In 2009, Taylor proposed that Taylor “make the full final deposit into the trust account,” without any offsets, and retain all insurance proceeds. Interior rejected Taylor’s proposal. Taylor continued the work. In 2011, Taylor requested reimbursement from the trust account for rig downtime costs. Interior denied the request. In 2018, the Interior Board of Land Appeals (IBLA) affirmed Interior’s 2009 and 2011 Decisions.Taylor filed suit in the Claims Court, asserting contract claims. The Federal Circuit affirmed the dismissal of the suit, rejecting “Taylor’s attempt to disguise its regulatory obligations as contractual ones,” and stating an IBLA decision must be appealed to a district court.In 2018, Taylor filed suit in a Louisiana district court, seeking review of the IBLA’s 2018 decision and filed a second complaint in the Claims Court, alleging breach of contract. On Taylor's motion, the district court transferred the case, citing the Tucker Act. The Federal Circuit reversed. The Claims Court does not have subject matter jurisdiction over this case. Taylor is challenging the IBLA Decision and must do so in district court under the APA. View "Taylor Energy Co., L.L.C. v. Department of the Interior" on Justia Law

by
The DC Circuit held that the Corps violated the National Environmental Policy Act (EPA) by issuing an easement allowing the Dakota Access Pipeline to transport crude oil through federally owned land at the Lake Oahe crossing site without preparing an environmental impact statement despite substantial criticisms from the Tribes.The court rejected the Corps' and Dakota Access' contention that the district court applied the wrong standard by relying on National Parks Conservation Association v. Semonite, 916 F.3d at 1083, which emphasized the important role played by entities other than the federal government. The court explained that the Tribes' unique role and their government-to-government relationship with the United States demand that their criticisms be treated with appropriate solicitude. The court concluded that several serious scientific disputes in this case means that the effects of the Corps' easement decision are likely to be "highly controversial." The court also noted that, although the risk of a pipeline leak may be low, that risk is sufficient that a person of ordinary prudence would take it into account in reaching a decision to approve the pipeline's placement, and its potential consequences are therefore properly considered. The court affirmed the district court's order vacating the easement while the Corps prepares an environmental impact statement. However, the court reversed the district court's order to the extent it directed that the pipeline be shut down and emptied of oil. View "Standing Rock Sioux Tribe v. United States Army Corps of Engineers" on Justia Law

by
MVP asked two Army Corps districts to verify that, pursuant to the Clean Water Act, MVP's proposed discharge of dredged and/or fill material into waters of the United States in furtherance of construction of a natural gas pipeline in those districts could be governed by the Army Corps' 2017 nationwide permit (NWP) referred to as NWP 12. The Huntington District issued a verification, determining that the Pipeline project met the criteria for operation under the NWP 12, excusing the project from the individual permitting process (the "Verification"). The Norfolk District did the same, issuing a reinstatement of its prior verification allowing MVP to use NWP 12 in that district (the "Reinstatement"). Petitioners filed petitions for agency review of the Verification and Reinstatement pursuant to the Natural Gas Act (NGA) and filed the instant motions to stay.The Fourth Circuit concluded that petitioners are likely to succeed on the merits of their petitions for review, and other equitable factors weigh in favor of granting the motions for stay. The court explained that the Verification was likely issued in contravention of applicable law because the Army Corps impermissibly incorporated into NWP 12 a modified permit condition from the West Virginia Department of Environmental Protection (WVDEP). Furthermore, because the Verification was likely issued in contravention of law, the Reinstatement (which necessarily depends on the validity of the Verification) is likely defective as well. Therefore, the court granted petitioners' motions for a stay of the Huntington District's Verification and the Norfolk District's Reinstatement until such time as the court may consider the petitions for review on their merits. However, the court concluded that petitioners are not likely to succeed on the merits of their challenges to the Army Corps' 2017 issuance of NWP 12 itself because the court likely lacks jurisdiction to entertain such challenges. View "Sierra Club v. U. S. Army Corps of Engineers" on Justia Law